Advisory #3 May 1, 2024 TOLEDO BEND RESERVOIR – WATER RELEASES AS OF TIME: 0530 hrs RESERVOIR ELEV: 172.50 FT. MSL SPILLWAY RELEASES HAVE CHANGED FROM 300 cfs TO 5000 cfs IN ACCORDANCE WITH THE GUIDE FOR SPILLWAY GATE OPERATIONS IN THE LICENSE APPROVED BY FERC FOR TOLEDO BEND RESERVOIR, CURRENT RELEASES ARE NOTED BELOW: SPILLWAY GATES …
Toledo Bend Reservoir Advisory #2 April 30, 2024
ADVISORY #2 DATE: Tuesday, April 30, 2024 TOLEDO BEND RESERVOIR – POTENTIAL WATER RELEASES Persons having interests in the Sabine River Basin below the reservoir are hereby advised that on Tuesday, April 30, 2024 at 1845 hours, the reservoir elevation was 172.44 ft. MSL. Currently, both generators are operating 24 hours per day. If the reservoir continues to rise, spillway …
Toledo Bend Reservoir Advisory #1 April 29, 2024
ADVISORY #1 DATE: Monday, April 29, 2024 TOLEDO BEND RESERVOIR – OPERATIONS Persons having interests in the Sabine River Basin below the reservoir are hereby advised that on Monday, April 29, 2024 at 0945 hours, the reservoir elevation was 172.35 ft. MSL. Currently,both generators are operating 24 hours per day. The spillway guide for both units operating at the powerhouse …
RFQ 24-0104E General Engineering Services 5-year Renewal
Please download RFQ 24-0104E General Engineering Services 5 year Renewal RFQ documents, Notice to Respondents, Experience Matrix and a sample MSA at the following link: https://www.sratx.org/about/forms/#doing-business Notice to Respondents RFQ 24-0104E Professional Engineering Services 5 year Renewal.pdf RFQ 24-0104E Professional Engineering Services 5 year Renewal.pdf RFQ 24-0104E Professional Engineering Services Experience Matrix.xl RFQ 24-0104E Sample MSA.pdf RFQ 24-0104E Addendum …
RFQ 24-0103 Engineering Services related to TWDB Regional Flood Planning Grant Funds
Please download RFQ 24-0103 TWDB Regional Flood Planning Grant RFQ documents and Notice to Respondents at the following link: https://www.sratx.org/about/forms/#doing-business Notice to Respondents RFQ 24-0103 TWDB Regional Flood Planning Grant Funds.pdf RFQ 24-0103 TWDB Regional Flood Planning Grant Funds.pdf
RFB 24-0301 LTD Stone for Rip Rap
Please download RFB 24-0301 Lake Tawakoni Division Stone for Rip Rap bid documents and Notice to Bid along with the proposed delivery locations at the following link: https://www.sratx.org/about/forms/#doing-business RFB 24-0301 NTB RFB 24-0301 LTD Rip Rap purchase.pdf RFB 24-0301 LTD Rip Rap.pdf RFB 24-0301 Proposed Locations.pdf
Public Meeting: Comments Draft 2024 Water Conservation and Draft Contingency Plan
The Sabine River Authority of Texas (SRA-TX) has scheduled two Sabine River Basin Steering Committee meetings on April 16 and 17, 2024, from 11:30 – 1:30. Included on the agenda for review and comment is the Draft 2024 Water Conservation and Drought Contingency Plan (WCDCP). The meeting times and locations are as follows: Tuesday, April 16, 2024 11:30 – 1:30 …
Region 4 Sabine Regional Flood Planning Meeting Scheduled
The next Region 4 Sabine-RFPG meeting is scheduled for April 15, 2024 at 1:30pm. More information can be found at https://www.sabine-rfpg.org/
SRA-TX Scheduled TCRP Steering Committee Meetings
SAVE THE DATE The Sabine River Authority of Texas (SRA-TX) has scheduled two Sabine River Basin Steering Committee meetings on April 16 and 17 from 11:30 – 1:30 to review the Draft 2024 Basin Summary Report for the Texas Clean Rivers Program (TCRP). These meetings allow stakeholders to have an active role in water quality monitoring in the Sabine River …
Sabine River Authority Board of Directors Meeting 3/14/24
The Sabine River Authority of Texas Board of Directors met Thursday, March 14, 2024, at 10:00 am in Center, TX. See Texas Secretary of State Open Meeting TRD=2024001352 for the specific location and the full agenda.